Solutions / Supplier Quality Improvement

Supplier Quality Improvement & Problem Resolution

The same defect. Another batch.

Get to the cause of defects that keep coming back.

Discuss a quality problem
Break the cycle
01

Why does the defect occur?

02

Why do existing controls miss it?

03

What evidence will show the fix works?

See what the work involves
Your starting point

You have repeated defects, rejected batches or unstable supplier quality. You need to protect current production and make a change that prevents the problem from recurring.

Why does this problem keep returning?

Distinguish between the cause of the defect and the reason existing controls missed it. Replacing a batch may contain the immediate problem without fixing either.

A recurring failure

More inspection can contain a defect.
It may not remove its cause.

Why does it occur?

Investigate the design, materials, tooling, process conditions and assembly that can create the failure.

Why does it escape?

Investigate the controls and measurement that should detect or prevent the nonconformity.

Protect current production while investigating the cause. Then verify the change in later production. Replacing a batch alone won’t prevent a repeat.

From assessment to implementation
01

Define and contain the problem

Agree the defect definition, measurement method and affected scope. Establish temporary controls and clear decisions for suspect stock.

02

Investigate the cause

Review samples, process settings, revisions and previous actions. Test why the defect occurs and why it gets through the existing controls.

03

Put corrective actions in place

Link the changes to the supported causes. Assign owners and dates, then verify changes to design, tooling, instructions, measurement or process control.

04

Check later production

Review results against agreed criteria over an appropriate follow-up period. If the problem returns, revisit the cause rather than repeating the same temporary fix.

What to bring

  • Failure definition, defect samples and affected lots
  • Inspection data and production or supplier history
  • Previous actions, recurrence dates and current containment

What the work can deliver

  • Problem definition and containment record
  • Cause analysis with evidence and open hypotheses
  • Corrective-action plan with named responsibilities
  • Effectiveness review and closure criteria

What’s next for your product?

Show us what you have and tell us what you need.

Discuss your project